Things have been moving a little slower than expected.
Things like track days etc keep getting in the way
Here are a few updates of the f/g layups
1. Dry weight with everything trimmed and ready for f/g
I'm pretty happy with the weight, but already have ideas to reduce further....
2. f/g layups started with bottom sides first
3. top side
4. after f/g layups have cured 1 day, 2nd coat of epoxy resin applied.
5. 3rd coat of epoxy resin applied and cured, ready for sanding and painting
(kind of a shame to cover these up )
I'm moving right into painting this week, so next update should be a little quicker
.