|
|
SUPPORT ZPOST BY DOING YOUR TIRERACK SHOPPING FROM THIS BANNER, THANKS! |
Post Reply |
|
Thread Tools | Search this Thread |
06-23-2017, 04:50 PM | #69 | |
Colonel
447
Rep 2,747
Posts |
Quote:
__________________
LINK TO 07 IR PHOTO JOURNAL:http://www.zpost.com/forums/showthread.php?t=1303735
LINK TO 06 IB MOD JOURNAL:http://www.zpost.com/forums/showthread.php?t=403119 |
|
06-23-2017, 06:10 PM | #71 |
Major
185
Rep 1,040
Posts |
You will have to call during our morning, they are 5-6hrs ahead of us. I called shortly after 9am and got a hold of them both days.
__________________
08 M Coupe • Ceramic Black Fabspeed Headers • MCS 1WNR • Poly FCAB • Stoptech BBK • Vibra-Tech • Epic Tune • Apex EC7 • RPI Scoop • Eventuri • Stromung • Rogue X Pipe • Varis Diffuser • CF E92 GTS Wing • CF Roof
|
Appreciate
0
|
06-24-2017, 08:08 PM | #72 |
Lieutenant
602
Rep 490
Posts |
Couple questions
A couple questions that have been asked and not answered:
"If each roof is made one at a time and there's a 2 week construction time does that mean if I jump in now it will be a year before I get the roof?" "Since the roof panel is not pre-drilled, do we have to drill and install inserts for the 4 bolts?" |
Appreciate
0
|
06-25-2017, 11:52 PM | #73 | |
Second Lieutenant
80
Rep 270
Posts |
Quote:
|
|
Appreciate
0
|
06-25-2017, 11:56 PM | #74 |
Second Lieutenant
80
Rep 270
Posts |
|
Appreciate
0
|
06-28-2017, 03:04 AM | #75 | |
Banned
12
Rep 97
Posts |
Quote:
I PM'd Chris regarding how long it will actually take. Hopefully he or the company can give a precise time. I wouldn't want to have to wait over a year for manufacturing time and delivery time on top. =( |
|
Appreciate
0
|
06-29-2017, 08:53 AM | #76 |
Private First Class
47
Rep 187
Posts |
I think it's pretty clear.
They build 2 roofs per month You would be waiting for over 1 year unless somehow Geoff Steel is able to increase production. Or maybe someone above you on the list re sells The install does involve a little work. Our OE Headliner is very expensive to replace if you were to damage it. |
Appreciate
1
crfine88447.00 |
06-29-2017, 10:02 AM | #77 |
Lieutenant
322
Rep 528
Posts
Drives: E86 Z4MC; E92 M3
Join Date: Jun 2015
Location: Cambridge, Ontario
|
The answer is to leave the headliner off and expose that sweet, sweet CF
__________________
E46 M3 Coupe 6MT Jet Black/Cinnamon GONE
E85 Z4M Roadster Imola Red/Black GONE E90 M3 Sedan 6MT Jerez Black/Fox Red GONE E86 Z4M Coupe Interlagos Blue/Black E92 M3 Coupe 6MT Interlagos Blue/Fox Red - Build Thread |
Appreciate
1
MOEDARE140.00 |
06-29-2017, 03:10 PM | #78 |
Lieutenant
59
Rep 535
Posts |
Ugh. I want in on this but I'm late to the party and not excited about waiting a year for a roof. Hmm... decisions, decisions.
__________________
|
Appreciate
0
|
06-29-2017, 06:16 PM | #79 | |
Colonel
447
Rep 2,747
Posts |
Quote:
Yes, we will have to drill add fasteners. The adhesive is ultimately what holds the roof to the car. The fasteners are primarily there to hold the roof in place while the adhesive sets up. I will be installing threaded inserts similar to OE
__________________
LINK TO 07 IR PHOTO JOURNAL:http://www.zpost.com/forums/showthread.php?t=1303735
LINK TO 06 IB MOD JOURNAL:http://www.zpost.com/forums/showthread.php?t=403119 |
|
Appreciate
0
|
06-29-2017, 06:25 PM | #80 | |
Colonel
447
Rep 2,747
Posts |
Quote:
__________________
LINK TO 07 IR PHOTO JOURNAL:http://www.zpost.com/forums/showthread.php?t=1303735
LINK TO 06 IB MOD JOURNAL:http://www.zpost.com/forums/showthread.php?t=403119 |
|
Appreciate
0
|
06-29-2017, 08:42 PM | #82 |
New Member
5
Rep 14
Posts |
I'm not part of the group buy, but I purchased a carbon roof on the 9th of June from Geoffsteel. I will follow up with them tonight on the status of the roof. It's 3 weeks since they started building, but I'm guessing this group buy will go a lot faster since they will be building them as they would in production. I'll let you guys know when I get it.
|
06-29-2017, 09:42 PM | #83 |
Major
149
Rep 1,108
Posts |
I thought I was in but such a long wait is really a downer but time is a small price to pay for a quality product. I guess I have another day to decide.
Last edited by CJW2OO4; 06-30-2017 at 10:32 AM.. |
Appreciate
0
|
07-03-2017, 10:17 AM | #88 | |
Colonel
447
Rep 2,747
Posts |
Final GB list update
Quote:
__________________
LINK TO 07 IR PHOTO JOURNAL:http://www.zpost.com/forums/showthread.php?t=1303735
LINK TO 06 IB MOD JOURNAL:http://www.zpost.com/forums/showthread.php?t=403119 |
|
Appreciate
0
|
Post Reply |
Bookmarks |
|
|