Production on the side pieces;
The sides are made with 2 separate pieces due to the complicated curves on multiple planes.
They are then joined before the layup stage.
Here are all the blanks for the sides after cutting out with the basic template.
And further along in production.
The left side pieces are partially complete showing the compound curve on the inside mating surface.
The lower side pieces for the right side of the car have been finished ready for final shaping/sanding.
To get to this stage, there are 5 separate procedures to go through, each with they're own templates & jigs.