View Single Post
      01-31-2013, 02:12 AM   #875
tikamak
Captain
Lebanon
58
Rep
912
Posts

Drives: 2006 Z4M Roadster TiAG/black
Join Date: Jun 2011
Location: Beirut

iTrader: (0)

Quote:
Originally Posted by Beedub View Post
it really wont take much as well, its only the intercooler pipe work that needs work, everything else fits like a glove and looks wonderful, its the 550/575 kits we want :-)

The software needs alittle work as well now.... it would be nice to be able to have a revision then kit owners wont feel the need to ask other vendors to do tunes, nothing is perfect and can always been improved, this is my only arguement with Ess id like to see continuation on product development, answer this and your onto a winner ;-) I still love my kit after ALL these years.....
I assume that the last VT2-500 beta was sold to myself and the intercooler pipe that was sent to me from ESS in Norway is a bunch of metal 90degrees pipes with elbows and worm clamps. Do you guys have this pipe like that? i think that the way this pipe is engineered is to be very flexible to fit in the engine bay without any problem and this could be the last revision before making it official.

I can provide pictures of it if you want.
Appreciate 0