Quote:
Originally Posted by mfanatic325
Alright guys, it's nearing that time for the shop to re-open. Ronald says to expect Paypal invoices around the end of the month. In the meantime, he's going to prepare the materials needed for a target run batch of 25 to accomodate for all the interested parties. Production itself probably won't take much more than a week in total, so my guess is that everyone should have their kits shipped to them by the end of September
|
hey, curious if we were still good to go with the threaded option. do i need to let him know when i pay?
Quote:
Originally Posted by mfanatic325
I told him that you guys wanted 10x1.25 thread pitch, at 1 inch length down from the top tip of the lever.
Diokef and Dorifto, please let me know ASAP if you guys still want to proceed with the threaded request. All these need to be sorted out before Ronald can go ahead into production.
|