Dropping the cats/pipes of at CPR Fabrication tomorrow. I am going to have the flange welded onto the cat and possibly have the cats slip fit onto the pipes, they will be clamped into place with a 304SS T-bolt clamp. I will also have CPR weld the SS bungs onto the cats. Hopefully the lead time isn't to long.
|